Case Study Preview: Lean Manufacturing & Supply Chain Improvements

Beckway improved operational efficiency and lowered overall operational cost for two $300M air-separation equipment factories located in China and Dubai.

Key Results:
• Decreased the inventory level by 20%
• Increased capacity by 30%
• Working hour saving up to 25%

Contact Beckway Managing Director, Roger Yan, at ryan@beckway.com for more information.