Home
»
Case Studies
»
Production Assessment and Lean Kaizen
Production Assessment and Lean Kaizen
$200M Contract Manufacturer
Background
- Rapidly growing contract consumer packaged goods (CPG) company was struggling with overall equipment effectiveness (OEE) and could not supply the market demand
- There dynamic was complicated as production was sourced through a contract manufacturer
Contributions
- 3-day assessment which led to an actionable rapid results plan
- 24×7 floor presence to coach and drive results
- Daily and weekly downtime and overall equipment effectiveness (OEE) reporting
- Implemented a visual management solution
- Optimized resource effectiveness through the development of leadership standard work (LSW) and skills assessment
- TPM program deployment and central claim management system (CMMS) selection and implementation
- 9 full day Kaizens, covering 38 operations SOPs
Results
- Improved OEE by 26 points in 12 weeks
- Doubled unit output within 12 weeks
- Improved transparency through redesigned metrics reporting, creating data driven improvement actions
- Transitioned from a 6×24 3 shift schedule to a 24×7 2 shift schedule
- Reduced downtime through CMMS implementation and a complete spares inventory plan